Spray Lakes

Client / Owner
Alberta Transportation
Scope of Work
Shotcrete MSE Wall Repair
Contract Value
$270,000.00
Project Description
Integrity Shotcrete Inc. was awarded the shotcrete scope of work for the Spray Lake MSE wall rehabilitation.

This unique and challenging project required shotcrete facing to rehabilitate and stabilize the existing face of an MSE wall along the narrow and busy Spray Lake road, just outside of Canmore, AB.

The specific challenges of the work were the requirements to shoot the shotcrete below the road, hanging over a 600’ high cliff. Traffic access needed to be maintained during the shotcrete application, providing only a 3.2m wide working area for equipment adjacent to the active road. The estimated shotcrete value was increased due to additional MSE wall failure from the time of tender to construction. We worked closely with the Contractor and Consultant to economize additional shotcrete volume and ensure the final product blended into the natural environment.

Despite a snowstorm in August, shutdowns due to high winds and multiple shutdowns due to wildlife within the area, Integrity Shotcrete completed the project on schedule and with zero safety or environmental incidents. Over 100m3 of shotcrete was applied to repair and rehabilitate the existing MSE wall. Upon completion, the project was nominated and won the innovation award within Alberta Transportation for the methods and means used to safely construct the project.



Project Gallery